Project List

No Client Project Building Location Year Tonnage
1 PT. Petrodrill Manufaktur Indonesia Welded Beam (Fabrication Only) - Karawang 2025 8
2 PT. Paramita Bangun Sarana Socimas (Fabrication Only) - Karawang 2025 488
3 PT. Paramita Bangun Sarana BU 19 IKK Project (Fabrication Only) - Karawang 2025 1,296
4 Wirya Krenindo Perkasa Welded Beam - Jakarta 2025 12
5 PT. Prima Sarana Mustika Dealer Mobil JGC Cakung Warehouse Cakung 2025 300
6 Petrosea, Tbk Harmonica Wiremesh Accomodation Building Lamongan 2025 3.080 pcs
7 PT. Wisana Matrakarya JETBLAST SQUADRON 12 JETBLAST Pekanbaru 2025 150
8 PT. Prima Sarana Mustika Showroom Indorent PIK 2 Showroom Jakarta 2025 262
9 PT. Wisana Matrakarya COVER DRAINAGE HANGAR DISPATCH Cover Drainage Pekanbaru 2025 60
10 PT. SNF Polymers Indonesia Renovation Building 01 Cikande 2025 29
11 Petrosea, Tbk UCC Non Accommodation Buildings UCC Non Accommodation Buildings Lamongan 2025 580
12 PT. SNF Polymers Indonesia TANK FARM 5 TANK FARM 5 Cikande 2025 29
13 PT. Silkar National RECEIPTION DOCK STORAGE BUILDING DOCK STORAGE Bekasi Utara 2025 7.35
14 PT. Jaya Obayashi WWTP PROJECT Admin & Sludge Building Jakarta 2025 1 LS
15 PT. Wisana Matrakarya Hangar Building New Skatek 045, ERS (Engine Repair Shop), Parachute Building, New Training Center Building (Academid and simulator) Pekanbaru 2025 661
16 PT. Jaya Obayashi Visitor Corridor Visitor Corridor Karawang 2024 168.18
17 PT. Titian Servis Indonesia UCC Project Double Bed Papua 2024 747.52
18 PT. Wisana Matrakarya Hangar Building Hangar Building Pekanbaru 2024 1LS
19 PT. SMCC Utama Indonesia KTB Warehouse Warehouse MM2100 2024 50
20 PT. Jaya Obayashi JKT 01 Pure DC Data center Bekasi 2024 117.04
21 PT. Tegar Pelabuhan Indonesia Pipe Rack Shell Blok M Sisi Utara - Jakarta 2024 92.64
22 PT. SNF Polymers Indonesia FLDPAM Factory Cikande 2024 827
23 PT. Jaya Obayashi JKT09-KIIC Karawang Barat Data Center Karawang 2024 3500
24 PT. Cipta Selaras Canteen ADM Masjid, Kantin, Loker Karawang 2024 413
25 PT. Wisana Matrakarya Construction of Warehouse Rafale Building Hanggar Building Pekanbaru 2024 88
26 PT. Tripatra Engineers and Constructors Akasia Bagus Factory Indramayu 2024 97
27 PT. Tripatra Engineers and Constructors EPC Shell Chrysalist Process Bulding Marunda 2023 238
28 PT. Wavin Manufacturing Indonesia Wavin New Factory Factory Batang 2023 650
29 PT. Jurong Engineering Lestari SS Works for PT Amman Mineral Nusa Tenggara Batu Hijau CCPP-1 - Sumbawa 2023 1785
30 PT. Karyadeka Graha Lestari Steel Structure for Habitat Entertainment Building Jakarta Selatan 2024 115
31 PT. Cella Emerald Logistik Cella Warehouse #3 Warehouse Narogong 2023 1955
32 PT. Trikarya Jaya Sejahtera Factory of PT All Cosmos Biotek Factory Sei Mangke-Simalungun 2023 398
33 KSO PT PP (Persero) - PT Elnusa, Tbk. Pembangunan Pipa Transmisi Gas Bumi Cirebon-Semarang Tahap 1 Pipa Transmisi Gas Bumi Cirebon-Semarang 2023 70
34 PT. SMCC Utama Indonesia Expansion Assembly & Corridor Bld Factory of PT Komatsu Indonesia Assembly & Corridor Building Factory Cakung 2023 74
35 PT. Hirochiku Asia Indonesia LPDC Auto Carrier - Jakarta 2023 16
36 PT. Zekon Indonesia Tower & Platform - Jakarta 2023 26
37 PT. Jaya Obayashi ADM Factory Extension Pabrik Karawang 2022 7334
38 PT. Cipta Baja Trimatra Cella Argya Logistik WH Phase 1&2 Gudang Cikarang 2022 405
39 PT. Shimizu Bangun Cipta Kontraktor Iris Ancillary Buildings Area Pabrik Karawang 2022 700
40 PT. Jaya Obayashi JKT 02 Data Centre Karawang Barat 2022 1690
41 PT. Takenaka Indonesia Indonesia Battery Cell JV Battery Building Karawang 2022 1800
42 PT. Wijaya Kusuma Contractor Central Market Golf Island Shopping Centre PIK 2022 331
43 PT. PrakarsaLanggeng MajuBersama Fabrication & Painting - Jakarta 2021 610
44 PT. Total Persada Indonesia Warehouse DLP Depok Warehouse Depok 2021 971,5
45 Penta Ocean Construction Co.,Ltd PVC Product Warehouse Warehouse Cilegon 2021 210,3
46 PT. Tatamulia Nusantara Indah Office B Kapal Api Office Building Jakarta 2021 173,75
47 PT. Surya Sarana Internasional Warehouse (64M L x 84M P) Warehouse Pekanbaru 2021 118,4
48 PT. Wirya Krenindo Perkasa (Grup Ekatama) Depo LRT - Jakarta 2021 557
49 PT. United Tractors Pandu Engineering Kompo TV DV Equipment Jakarta 2021 30
50 PT. SAKA SMAK Don Bosco Sekolah Sumba 2021 164
51 PT. Citra Buana Kreasi Pratama Pabrik Sepatu PT. Aerrostar Indonesia Pabrik Sepatu Bantar Gebang 2021 53,7
52 PT. Pusat Sarana Baruna Interport Business Park Chemical Storage, Cold Room, and Gas Bottle Storage Balikpapan 2021 1 Ls
53 PT. Entek Separindo Asia HVAC Platform Platform Cileungsi 2021 1 Ls
54 PT. Jaya Obayashi CGK 063 Data Centre Karawang 2021 635
55 PT. Interport Industrial Park Warehouse 3A Phase II Gudang Balikpapan 2021 1 Ls
56 PT. JGC Indonesia Marunda 2.0 Shell Indonesia Shell Workshop Marunda 2021 457
57 PT. Interport Mandiri Utama Kariangau Development - Emily Gudang Balikpapan 2021 1 Ls
58 PT. Nippon Indosari Corporindo, Tbk. New Factory Sari Roti Pabrik Riau 2020 753
59 PT. Mega Aruna Nusantara Properti MMP Warehouse #17 Gudang Surabaya 2020 1450
60 PT. Jaya Obayashi CGK 062 Pontoon Bridge Data Centre Karawang 2020 28
61 PT. Jaya Obayashi CGK 061 Pontoon Bridge Data Centre Cikarang 2020 448
62 PT. Mowilex Indonesia New Factory Mowilex Pabrik Cikupa 2020 900
63 PT. Bentoel Prima New Tobacco Feeder & CRT Pabrik Malang 2020 100
64 PR Bintang Sayap Insan PR Bintang Sayap Insan Gudang Distribusi Utama & Sekunder Malang 2020 404
65 PT. Tatamulia Nusantara Indah Softex Indonesia Phase 2 Pabrik Jakarta 2019 975
66 PT. Murinda Iron Steel Mori Building Office Building Jakarta 2019 5000
67 PT. Softex Indonesia Softex New Facility Phase 2 Pabrik Karawang 2019 913
68 PT. PRASETYA BAJRA PRIMA PT. PRASETYA BAJRA PRIMA PLTM Endikat Sumatera Selatan 2019 89
69 PT. GLOBAL DAIRI ALAMI PT. GLOBAL DAIRI ALAMI Milk Processing Plant #46 Jawa Barat 2019 650
70 PT. TATAMULIA NUSANTARA INDAH Softex Karawang Minor building, office, canopy & parking area Karawang 2019 53
71 PT. RADIANT MESTIKA EKATAMA PT. RADIANT MESTIKA EKATAMA New Warehouse at Palembang Palembang 2018 54
72 PT. Firgar Enjiniring Indonesia Rumah Kost Jasa Blasting & Painting Cilandak 2018 136
73 PT. Paramita Bangun Sarana, Tbk Sungai Kapuas 80 TPH Palm Oil Factory Fabrikasi Steel Structure Kalimantan Barat 2018 545
74 PT. Sentra Artistry Kurnia Agung Gereja ST. Yohanes Permandi Gereja Kalimantan 2018 80
75 PT. SILKAR NATIONAL Kantor Silkar Metland Cipondoh Structure Baja Tangerang 2018 420
76 PT. JGC Indonesia PERTAMINA EP CEPU The Jambaran – Tiung Biru Field CEPU 2018 467
77 PT. SENTRA ARTISTRY KURNIA AGUNG / Workshop Net Wave Workshop Jakarta 2018 105
78 PT. Ting Tai Konstruksi Indonesia PLTU Kalselteng 2 Platform Chimney Ladder Kalselteng 2018 57
79 PT. Inti Karya Persada Tehnik PT. Petrokimia Butadiene Indonesia PBI B1 / MTBE Banten 2018 929
80 PT. Danwo Steel Sejati PLATFORM UNIT 41/42/43 Fabrikasi Jakarta 2018 150
81 PT. Danwo Steel Sejati Zinc Power Fabrikasi Cikupa 2018 200
82 PT. Danwo Steel Sejati PT. Mega Dharma Property Fabrikasi dan pengecatan Marunda 2018 300
83 PT. Global Dairi Alami PT. Global Dairi Alami Building Milk Processing & farms Subang 2018 800
84 PT. CIPTA BAJA TRIMATRA MMP WAREHOUSE #14 Fabrication & Installation Warehouse Cikarang 2018 1482
85 PT. SIEMENS INDONESIA PT. SIEMENS INDONESIA Steel Support For GIL Jakarta 2018 67
86 PT. BINERKAHAN HENTA PUTRA STASIUN MEDAN STASIUN Medan 2018 141
87 PT. Jatim Bromo Steel Stasiun Jati Cempaka Truss LRT Jakarta 2018 92
88 PT. ANDAL REKACIPTA PRATAMA PLTM LAWE SIKAP GUEST HOUSE Aceh 2018 88
89 PT. CIPTA SELARAS PT. ADIS DIMENSION FOOTWEAR Fbrikasi dan install pekerjaan struktur baja Banten 2018 138
90 PT. Teguh Mandiri Sarwa Tunggal PT. Teguh Mandiri Sarwa Tunggal Fabrikasi Kcolumn Lift – Wisma Atlet Jakarta 2018 62
91 PT. JATIM BROMO STEEL AHM DAWUAN Fabrikasi Konstruksi Baja Karawang 2018 135
92 PT. MODERN WIDYA TECHNICAL FAME HOTEL Fbrikasi Struktur Baja Fame Hotel Papua 2018 230
93 PT. NIPPON INDOSARI CORPORINDO Tbk. PT. NIPPON INDOSARI CORPORINDO Tbk. Steel Structure Gresik 2018 550
94 PT. TATAMULIA NUSANTARA INDAH SOFTEX INDONESIA Erection Karawang 2018 2124
95 PT. PRIMA TEHNIK CRANE PT. PRIMA TEHNIK CRANE Gantry Crane 2x40T Jakarta 2018 76
96 PT. MURINDA IRON STEEL TANJUNG JATI B EXPANSION (Jawa-4) Central Control Bldg. Central Java 2018 5000
97 PT. CIPTA SELARAS TELKOM Office Data Center Telkom Sentul 2018 99
98 PT. SANGGAR SARANA BAJA PT. SANGGAR SARANA BAJA Cut & Rolling Plate Jakarta 2018 392
99 PT. Modern Widya Tehnical OKI Mill Project Tissue Machine Hall TMH#2-1 OKI 2017 800
100 PT. Sarana Abadi Makmur Bersama Warehouse 50mW x 102 mL Warehouse PT. Sarana Abadi Makmur Jakarta 2017 248
101 PT. Paramita Bangun Sarana Tissue Culture Phase II Steel Structure Bogor 2017 500
102 PT. Murinda Iron Steel PT. Murinda Iron Steel Built Up H Jakarta 2017 255
103 PT. SMCC Utama Indonesia PT. Maxxis International Indonesia New Factory – Bldg. 139 Cikarang 2017 607
104 PT. Cipta Baja Trimatra Gudang MMP Blok AE3 Warehouse 6 Jakarta 2017 597
105 PT. Cipta Selaras Lexus Gallery Pluit Fabrikasi & Instalasi Jakarta 2017 278
106 PT. Jaya Obayashi PT. Tokyuland Indonesia Apartement Jakarta 2017 107
107 Tokyu – Wika Joint Operation Jakarta Mass Rapid Transit Lebak Bulus Station Lebak Bulus 2017 100
108 ATMI Cikarang ATMI Cikarang Dormitory ATMI (22m x 40 m) Cikarang 2017 127
109 PT. Modern Widya Tehnical OKI Mill Project WWTP OKI Mill Project WWTP OKI 2016 300
110 PT. Kobe Boga Utama PT. Kobe Boga Utama Fabrication & Installation Building Structure Tangerang 2016 520
111 PT. Satyaraya Keramindoindah PT. Satyaraya Keramindoindah Platform Structure Tangerang 2016 178
112 PT. Mutiara Endikat Hotel Santika Palembang Atap Baja Hotel Santika Palembang 2016 154
113 PT. Tokyu Construction Indonesia Jakarta Mass Rapid Transit MRT Jakarta 2016 1862
114 PT. Cipta Karsa Dinamika PT. Metro Pearl Indonesia Shoes Factory Purwakarta 2016 744
115 PT. Wijaya Karya Industri & Konstruksi PT. Wijaya Karya Industri & Konstruksi Welded Beam 2016 131
116 PT. Phinisi Sulawesi The Rinra Hotel Makasar Cinema Makasar Makasar 2016 164
117 PT. Silkar National PT. Cikarang Listrindo Workshop & Warehouse Bekasi 2016 145
118 PT. Danwoo Steel Sejati PT. Danwoo Steel Sejati Shoes Factory Brebes 2016 500
119 PT. Cipta Selaras Auto 2000 - Cabang Way Halim Fabrication & Erection Lampung 2016 176
120 PT. SMCC Utama Indonesia PT. Maxxis International Indonesia New Factory Cikarang 2016 3050
121 PT. Silkar National PT. Cikarang Listrindo Conveyor Bridge Bekasi 2016 525
122 Gereja St. Kim Tae Gon Gereja St. Kim Tae Gon Gereja Jakarta 2016 160
123 PP-Taisei Indonesia Construction Asahimas Batch Warehouse Warehouse ( Erection) Cikampek 2015 181
124 PT. SLP Internusa Karawang PT. SLP Internusa Karawang Warehouse Blok A2 (erection) Karawang 2015 794
125 Panitia Pembangunan GKP Pulogebang Gedung Karya Pastoral Santo Gabriel Gereja Jakarta 2015 250
126 PT. Bakti Nugraha Yuda Energy PT. Bakti Nugraha Yuda Energy Silo Kap. 150 CBM Jakarta 2015 30
127 PT. Wijaya Karya PT. Wijaya Karya Fabrikasi Welded Beam - Proyek Jemb. A25 Brantas Jakarta 2015 46
128 Univ. Gunadarma Univ. Gunadarma Auditorium & facade Jakarta 2015 500
129 PT. Gunung Steel Cobstruction PT. Wahana Sentra Sejati (Jasa Fabrikasi) Harco Glodok (fabrikasi) Glodok 2015 5000
130 PT. Modern Widya Tehnical PT. Modern Widya Tehnical Treated Water Plant (fabrikasi) OKI 2015 314
131 PT. Paramita Bangun Sarana PT. Paramita Bangun Sarana Biodiesel Plant (fabrikasi) Marunda 2015 2332
132 PT. Procter & Gamble PT. Procter & Gamble Warehouse Center (erection) Karawang 2015 1227
133 PT. Silkar National PT. Cikarang Listrindo Babelan Coal Fired Power Station (19 Building) Marunda 2015 124
134 PT. Fabs Indonesia Fabs Production Facility (Erection) Cikande 2015 225
135 PT. Wijaya Perdana Gedung SESKOAL Gedung Theater Kelas Gabungan Seskoal Cipulir 2015 322
136 PT. Gunung Garuda Steel PT. Gunung Garuda Steel Jembatan Truss B50 (fabrikasi) 2015 136
137 PT . Citra Karsa Dinamika PT. Tetra Pak New Building (erection) Cibitung 2015 423
138 PT. Cipta Selaras Toko Roti Orion Toko Roti Solo 2015 307
139 Univ. Gunadarma Univ. Gunadarma Rumah Kumpul Lenteng Agung 2015 197
140 PT. Buana Abadi Sejahtera PT. Buana Abadi Sejahtera Stasiun Kebayoran (Fabrikasi dan painting) Kebayoran 2015 450
141 Penta Ocean Construction Co.,Ltd PT. Asahimas Chemical Pipe Rack – Phase – 6 Expansion Cilegon 2015 800
142 PT. Paramita Bangun Sarana golden chemical renewable Fa Alchohol Tank Farm Pipe Rack Lubuk Gaung 2015 1219
143 PT. Wijaya Karya PT. Wijaya Karya Roll Siku, Roll WF, Roll Pipe Jakarta 2015 0
144 PT. Multi Saka Abadi PT. Multi Saka Abadi Gudang Tinta + Building 6 Bekasi 2015 160
145 PT. Oriental Sheet Piling MRT Bracket & Temp. Support Beam Jakarta 2015 197
146 PT. Wijaya Karya Jembatan A45 Welded Beam Cileugsi 2014 109
147 PT. Paramita Bangun Sarana Tarjun Phase IV Biodiesel Kal Sel 2014 951
148 PT. Silkar National Cikarang Listrindo Pipe Rack Babelan 2014 219
149 PT. Dwipa Bhirawa Persada Kampus STIN Mess Putri Sentul 2014 86
150 PT Andika Wijaya Sarana Kampus STIN Sarana Prasana Kampus Sentul 2014 122
151 PT. Paramita Bangun Sarana Tarjun Phase IV Shop drawing Solvent Extraction Plant Kal Sel 2014 1407
152 PT Waagner Biro Indonesia Mahakam Bridge Jembatan Kutai 2014 139
153 PT. Silkar National Cikarang Listrindo CAB BUILDING Babelan 2014 276
154 PT. Paramita Bangun Sarana Tarjun Phase IV Erection Dry Coal Sheed Building, Kal Sel 2014 106
155 PT Murinda Iron Steel NUTRIFOOD Jasa Fabrikasi Steel Structure + Painting 3 coats Cibitung 2014 514
156 PT Murinda Iron Steel PT Murinda Iron Steel Fabrikasi Truss Jakarta 2014 200
157 PT Muri Agung Abadi Furukawa Fabrikasi Tappered & Welded, Column Karawang 2014 70
158 PT Murinda Iron Steel Puri Matahari Fabrikasi Truss Jakarta 2014 200
159 PT Leighton Contractors Indonesia Fontera – Borobudur Warehouse , Locker & mushallah,Chemical & Hazardous Cikarang 2014 145
160 PT. Multi Kreasi Develindo PT. NS Bluescope Indonesia Shearing and Building Installation Cilegon 2014 211
161 PT. P&G PT. Procter & Gamble Operation Indonesia FC Production Building – PEMB (Erection Only) Jakarta 2014 1280
162 PT Leighton Contractors Indonesia Evoluzione Tyres Indonesia Moto Plant Project Factory Subang 2014 800
163 PT. Bluescope Lysaght Indonesia PT. JFE Galvanizing Indonesia Shimizzu (Erection on;y) Cibitung 2014 800
164 PT. P&G PT. Procter & Gamble Operation Indonesia PEMB Bidding Guide of P & G Karawang 2014 737
165 PT. Silkar National Cikarang Listrindo Coal Fired Power Plant Babelan 2014 578
166 PT. Meindo Elang Indah EPCI for GG New Field Development EPCI for GG New Field Development Balongan 2014 130
167 PT Leighton Contractors Indonesia Coca Cola – Semarang Fire Water Storage Tank Semarang 2014 0
168 PT Leighton Contractors Indonesia Coca Cola – Semarang Warehouse Coca Cola (Erection only) Semarang 2013 603
169 PT Meindo Elang Indah Salamander Energy Ltd. EPCI of Kerendan Gas Facilities (Fabrication Only) 2013 152
170 PT Incasi Raya Group PT. Selago Makmur Plantation Physical Refinery Cilegon 2013 1053
171 PT Murinda Iron Steel PT Murinda Iron Steel Pipa dia 5” (139.7 x 3,5 ) Incl. Drain Hole (fab. Only) Cikarang 2013 200
172 PT. Jaya Obayashi PT. Isuzu Astra Motor Indonesia GA SHOP 100 m x 195 m = 19500 m2 karawang 2013 1089
173 PT. Paramita Bangun Sarana Tarjun Phase IV Power Plant 2 x 10 MW (Section 2) (Fabrication Only) Kal Sel 2013 781
174 PT. Samudra Teknindo Hydraumatic PT. Indonesia International Expo Steel Structure (fabrication Only) BSD 2013 900
175 PT Bluescope Lysaght Indonesia Coca Cola Steel Structure (Fabrication Only) Semarang 2013 480
176 PT Bluescope Lysaght Indonesia Petrosea pw4 Warehouse (Fabrication Only) Jakarta 2013 93
177 PT. Platinum Ceramics Industri PT. Platinum Ceramics Industri Warehouse Karawang 2013 803
178 PT Bluescope Lysaght Indonesia Fujicon Office (Fabrication Only) Sumedang 2013 362
179 PT. SMCC Utama Indonesia PT. Kramayuda Tiga Berlian Warehouse Cibitung 2013 915
180 PT. SMCC Utama Indonesia PT. SANKYU New Warehouse Karawang 2013 38
181 PT. Paramita Bangun Sarana LAMPUNG PHASE II Tower Unloading (Fabrication Only) Lampung 2013 44
182 PT. Paramita Bangun Sarana Marunda Refinery Plant New Warehouse (Fabrication Only) Bekasi 2013 1389
183 PT. Paramita Bangun Sarana PKE Extention Fabrikasi Rafter (Fabrication Only) Lampung 2013 61
184 PT. Takenaka Indonesia HPM 2” Factory New Factory Karawang Timur 2013 664
185 PT. Surya Cipta Swadaya Technopark New Factory (Erection Only) Karawang 2013 817
186 Universitas Gunadharma - Gedung Kelas Baru – Kampus G Jakarta 2012 143
187 PT Intraco Lestari PT Siemens Indonesia Built Up/ Welded Beam (Supply and Fabrikasi) Cilegon 2012 102
188 PT Cipta Selaras VDC – BMW Parkir Jakarta 2012 677
189 PT SMCC Utama Indonesia PT Katsushiro Indonesia New Factory and Office Cibitung 2012 606
190 PT Bluescope Lysaght Coca Cola Fabrication works Cibitung 2012 1159
191 PT Jaya Obayashi PT SGI Indonesia Erection works Cikarang 2012 684
192 PT Leighton Contractors Indonesia Coca Cola Erection works Cibitung 2012 1159
193 PT SMCC Utama Indonesia PT Toshiba Consumer Product Indonesia New Warehouse (Fabrication Only) EJIP-Cikarang 2012 207
194 PT Bluescope Lysaght PT SGI Indonesia Factory – Steel Structure (fabrication Only) Cikarang 2012 400
195 PT Bluescope Lysaght Tupperware Steel Structure (fabrication Only) Cikarang 2012 410
196 PT Indonakano PT Sugiura Indonesia New Factory Karawang 2012 200
197 PT Indonakano PT Sekiso Industries Indonesia Expansion Factory Karawang 2012 50
198 PT Bhakti Nugraha Yuda Energy PLTU Batu Raja 2 x 10 MW Main Power Batu Raja 2012 1328
199 PT Gasuma Federal Indonesia MFSGU – Tuban Steel Structure 2011 194
200 PT Murinda Iron Steel Gudang Garam Steel Structure (fabrication Only) 2011 510
201 PT Bahas Rekastya - Gudang Central (Fabrication Only) 2011 118
202 PT Cipta Selaras PT. Astra Daihatsu Motor Canteen & Mushola 2011 330
203 PT. Epiterma Mas Indonesia KMT Project Pipe Rack (Fabrication Only) 2011 118
204 PT. SMCC Utama Indonesia PT. Nippon Shokubai Indonesia Steel Structure Building,equipment and piperack 2011 2060
205 PT Hamparan Alam Baruna Indonesia Gudang Pupuk Ext. Warehouse – Main Warehouse – Utility 2011 914
206 PT Bluescope Lysaght Indonesia PT. Freeport Warehouse (Fabrication Only) 2011 150
207 PT Krakatau Engineering Zero Reformer Pipe Rack (Fabrication Only) 2011 161
208 PT Duta Megah Persada - Office Building (fabrication Only) Jakarta 2011 260
209 PT Titan Cipta Sinergy PT. Chevron Geothermal Indonesia Building Shelter (Fbarication Only) Bogor 2011 65
210 PT Indonakano PT Sunchirin Industries New Factory Karawang 2011 82
211 PT Anugerah Cipta Selaras - Castilleted Beam (Fabrication Only) Jakarta 2011 112
212 PT AIKO Tekindo Sakti - Roll Plate Only Jakarta 2011 100
213 PT SMCC Utama Indonesia PT Kramayudha Tiga Berlian New Factory Pulo Gadung 2011 223
214 PT SMCC Utama Indonesia PT Shinko Plantech Steel Structure Works For Condenser Tower Cikarang 2011 57
215 PT Bluescope Lysaght PT ICA Alumina Warehouse (Fabrication Only) Cikarang 2011 337
216 PT Kreasi Usaha Jaya PT. Citra Anugerah Karya Workshop (Fabrication Only) Cikarang 2011 176
217 PT Bintang Putra Bangunan PT Kideco Jaya Agung Workshop (Fabrication Only) Kalimantan 2011 113
218 PT Nusa Raya Cipta PT Puninar Pacific Factory Cakung 2011 850
219 PT Zentha Maharddhika Giant Buaran Steel Structure Bekasi 2011 39
220 Universitas Gunadharma Lapangan Futsal Jakarta 2011 125
221 PT. ICI Paint Indonesia Garuda Project Warehouse Cikarang 2011 166
222 PT Bluescope Lysaght Indonesia Universitas Brawijaya Tennis Court (fabrication only) Malang 2010 87
223 PT Platinum Ceramics Ext. Factory Factory Cikarang 2010 442
224 PT Mandalika Sakti PT CahayaMandiriPerkasa Pabrik Kelapa Sawit (fabrication only) Jakarta 2010 200
225 PT Multi Saka Abadi PT Multi Saka Abadi Warehouse Tahap 2 (civil+Steel) Bt. Gebang 2010 50
226 PT Sukanda Jaya PT Sukanda Jaya Diamond – (Erection only) Cibitung 2010 159
227 PT Bluescope Lysaght Indonesia PT Sukanda Jaya Diamond – (fabrication only) Cibitung 2010 159
228 PT Ciptamega Arief Sejati PT Tong Hong (Workshop) Cikande 2010 335
229 PT San Fang Indonesia PT San Fang Indonesia Rack Cikande 2010 195
230 PT Ciptamega Arief Sejati PT San Fang Indonesia Factory Cikande 2010 1172
231 PT Cipta Selaras PDC Danau Sunter Ext. Astra Int'l – Daihatsu PDC Extension Sunter 2010 1243
232 Hirochiku co.Ltd PT Kyowa Indonesia HM III – 1500 Melting Furnace Cikarang 2010 2 unit
233 PT Indocement Tunggal Prakarsa PT Indocement Tunggal Prakarsa Modifikasi Overhead Crane Citeureup 2010 1 unit
234 Hirochiku Asia (Thailand) co.Ltd PT. Mitra Metal Refractory replacement for 5 unit C II – 510 S Holimesy Karawang 2010 5 unit
235 Gereja Santo Gabriel Gereja Santo Gabriel Gereja Pulo Gebang 2010 315
236 PT Bluescope Lysaght PT Impact Pratama PT Impact Pratama (fabrication only) Jakarta 2010 300
237 PT. Cipta Mega Arief Sejati PT. San Fang Indonesia Workshop / Factory Cikande 2010 1171
238 PT Meindo Elang Indah Petrochina Jabung International; Ltd Warehouse (Fabrication Only) Jambi 2010 400
239 PT Bluescope Lysaght Indonesia PT Alam Sutera Living World (Fabrication Only) Tangerang 2010 204
240 PT MHE – Demag Pertamina Monorail (Fabrication Only) Jakarta 2010 0
241 PT Harmoni Satya Sukses Container Chassis 45 FT Container Chassis (Fabrication Only) Jakarta 2010 210 set
242 PT Geoservices Ltd. CNOOC Oxygen & Acetylene Cilinder Basket (Fabrication Only) Jakarta 2010 45
243 PT Alstom Power ESI Muara Tawar Power Plant Power Plant (Fabrication Only) Muara Tawar 2010 84
244 PT Bluescope Lysaght Indonesia PT Pabrik Kertas Leces (Persero) Coal Storage Building (Fabrication Only) Probolinggo 2010 160
No Client Project Year   

Progres  

1

PT KILANG PERTAMINA INTERNASIONAL RU VI

OVERHAUL TANK 42-T-102B DIMENSION 68600 MM ID x 15500 MM H

2023

On Going

2

PT KILANG PERTAMINA INTERNASIONAL RU VI

OVERHAUL TANK 42-T-102B DIMENSION 59700 MM ID x 15500 MM H

2023

On Going

3 PT JGC INDONESIA

DRUM JETTY KO DRUM (D-101) DIMENSION 1800 MM ID x 5400 MM T/T

BOG SUCTION DRUM (D-301) DIMENSION 1500 MM ID x 3000 MM T/T

DRAIN POT (D-303) DIMENSION 1100 MM ID x 3300 MM T/T

PLANT AIR RECEIVER (D-401) DIMENSION 3000 MM ID x 9600 MM T/T

INSTRUMENT AIR RECEIVER (D-402) DIMENSION 3800 MM ID x 14500 MM T/T

NITROGEN RECEIVER (D-403) DIMENSION 2490 MM ID x 6810 MM T/T

NITROGEN BUFFER VESSEL (D-404) DIMENSION 3000 MM ID x 7700 MM T/T

LP FLARE KO DRUM (D-601) DIMENSION 1400 MM ID x 4200 MM T/T

HP FLARE KO DRUM (D-602) DIMENSION 1800 MM ID x 5400 MM T/T

2023

On Going

4 PT GEPTRONIKA SENTOSA UTAMA FABRIKASI METERING SPOOL & SKID PIPE DIMENSION 8" SCH. 80-ANSI 300# SKID DIMENSION 8930 MM x 2287 MM x 2500 MM H 2023 Finish
5 PT MAXITHERM BOILERS INDONESIA TOP & BOTTOM DRUM 30DNL TOP DRUM DIMENSION 1100 MM ID x 10394 MM S/S BOTTOM DRUM DIMENSION 760 MM ID x 10394 MM S/S 2023 Finish
6 PT MITRA PRANA ABADI SENTOSA PIPING SKID PACKAGE DIMENSION 4896 MM L x 2199 MM W x 4974 MM H 2023 Finish
7 PT NEUMAN & ESSER SOUTH EAST ASIA LTD ENGINE BASE FRAME & FUEL GAS SKID 2023 Finish
8 PT TRACON INDUSTRI PIPE SPOOL 2023 Finish
9 PT MAXITHERM BOILERS INDONESIA TOP & BOTTOM DRUM DLFX 45 TOP DRUM DIMENSION 1200 MM ID x 9660 MM S/S BOTTOM DRUM DIMENSION 900 MM ID x 9680 MM S/S 2023 Finish
10 PT ALFA SEMESTA CEMERLANG GAS FILTER DIMENSION 273 MM OD x 1250 MM S/S 2023 Finish
11 PT KILANG PERTAMINA INTERNASIONAL RU VI BUNDLE ASSY 34-E-101 2023 Finish
12 PT DWI TUNGGAL JAYA ABADI INSTRUMENT AIR RECEIVER & UTILITY AIR RECEIVER 2022 Finish
13 PT DEXA ENERGY VERTICAL PRESSURE VESSEL 2022 Finish
14 PT BORMINDO NUSANTARA MUD GAS SEPARATOR 2022 Finish
15 PT GEPTRONIKA SENTOSA UTAMA AIR RECEIVER TANK 2022 Finish
16 PT MAXITHERM BOILERS INDONESIA TOP & BOTTOM DRUM 6 MDN 2022 Finish
17 PT GEPTRONIKA SENTOSA UTAMA FABRIKASI MATERING SPOOL & SKID 2022 Finish
18 PT CAKUNG PRIMA STEEL GROUND TANK 600L SQUARE 2022 Finish
19 PT MAXITHERM BOILERS INDONESIA TOP & BOTTOM DRUM BOILER TYPE 2MDN / 2100 2022 Finish
20 PT ENTEK SEPARINDO ASIA INSTALLATION OF TRIM SYSTEM 2022 Finish
21 PT BHUMI PHALA PERKASA VIKTOR NEW GROSS SEPARATOR 2022 Finish
22 PT SURYA MAX INDUSTRIES TOP & BOTTOM DRUM BOILER 2022 Finish
23 PT DEXA ENERGY VERTICAL PRESSURE VESSEL 2022 Finish
24 PT ENTEK SEPARINDO ASIA INSTALLATION GRINDER 2022 Finish
25 PT JABAR UTAMA ENGINEERING CUTTING ACCESSORIES PLATE FOR LONG BOOM 2021 Finish
26 PT BHUMI PHALA PERKASA "TUBE BUNDLE (2 UNIT)TUBE SHEET : OD 1054 X 88 (A516 Gr.70)U TUBE : OD 19.05 X 2.11 MIN WALL (ASTM A179)" 2021 Finish
27 PT UNITED TRACTORS PANDU ENGINEERING BODY ASSY WT 35 KL 2021 Finish
28 PT MAXITHERM BOILERS INDONESIA JASA FABRIKASI TOP & BOTTOM DRUM BOILER 2021 Finish
29 PT KARYA BAJA INDONESIA ENCLOSED GROUND FLARE STACK 2021 Finish
30 PT NIPPON INDOSARI CORPINDO TBK SS SILO OUTDOOR CAP 30T & STRUCTURE SILO 2021 Finish
31 PT MIPCON PRIMA INDUSTRI TUBE BUNDLE GLYCOL HE E-330 2021 Finish
32 PT MAXITHERM BOILERS INDONESIA FABRIKASI TOP & BOTTOM DRUM BOILER 2021 Finish
33 PT KOMALASARIVESSEL ID 20" 2021 Finish
34 PT MULTIKARYA ASIA PASIFIK RAYA VERTICAL FILTER COALESCER 2021 Finish
35 PT BORMINDO NUSANTARA MUD GAS SEPARATOR 2021 Finish
36 PT BHUMI ARTHAPRIMA CEMERLANG INSTRUMENT AIR DRYER TOWER 2021 Finish
37 PT ENTEK SEPARINDO ASIA HOT WATER VESSEL CAP 5.3 M3 2021 Finish
38 PT BHUMI PHALA PERKASA COMPRESSOR KO DRUM (C-201-09) 2021 Finish
39 PT ENTEK SEPARINDO ASIA INSTALLATION BULK & PIPING SYSTEM 2021 Finish
40 PT MAXXIS INTERNATIONAL INDONESIA COMPRESSOR TANK 2021 Finish
41 PT ATLAS COPCO INDONESIA AIR RECEIVER TANK CAP 1500 LTR & 6000 LTR 2021 Finish
42 PT BHUMI PHALA PERKASA "TUBE BUNDLE (3 UNIT)TUBE SHEET : OD 1054 X 88 (A516 Gr.70)U TUBE : OD 19.05 X 2.11 MIN WALL (ASTM A179)" 2021 Finish
43 PT PP (PERSERO) SCRUBBER & STACK PT PUPUK ISKANDAR MUDA 2020 Finish
44 PT PERTAMINA (PERSERO) RU IV CILACAP OVERHAUL TANKI 42-T-105B 2020 Finish
45 PT CITRA DUA SEJATIFLARE STACK 2020 Finish
46 PT PATRA DRILLING CONTRACTOR PIG LAUNCHER & RECEIVER 2020 Finish
47 PT ATLAS COPCO AIR RECEIVER TANK 1000 L (1 UNIT) 2020 Finish
48 PT BINA SARANA PUTRA INSTRUMENT GAS KO POT (1 EA) & HORIZONTAL LIQUID KO POT (2 EA) 2020 Finish
49 PT JGC INDONESIA SHOP FABRICATED TANKS 2020 Finish
50 PT JGC INDONESIA INSTRUMENT AIR / PLANT AIR RECEIVER 2020 Finish
51 PT MAXXIS INTERNATIONAL INDONESIA STEAM REDUCER & LOW VACUUM FILTER SEPARATOR 2020 Finish
52 PT PATRA DRILLING CONTRACTOR PIG LAUNCHER & GAS FILTER COALESCER 2020 Finish
53 PT BHUMI PHALA PERKASA "TUBE BUNDLE (3 UNIT)TUBE SHEET : OD 1054 X 88 (A516 Gr.70)U TUBE : OD 19.05 X 2.11 MIN WALL (ASTM A179)" 2020 Finish
54 PT BHUMI ARTHAPRIMA CEMERLANG CARBONATE FILTER & MECHANICAL FILTER 2020 Finish
55 PT INDOKOMAS BUANA PERSADA CHILLED WATER THERMAL STORAGE TANK 2020 Finish
56 PT SHAFTINDO ENERGI TUBE BUNDLE (HBG-1645) 2020 Finish
57 PT SULFINDO ADIUSAHA HYPO TANK 4400 MM ID X 4600 MM 2020 Finish
58 PT BUKAKA TEKNIK UTAMA JASA FABRIKASI SHELL HE 901A 2020 Finish
59 PT NINDYA KARYA PIG LAUNCHER & PIG RECEIVER / 16" NPS (MINOR BAREL) x 20' NPS (MAJOR BAREL) PIPE API 5L-X52 2020 Finish
60 PT BHUMI PHALA PERKASA "TUBE BUNDLE (3 UNIT)TUBE SHEET : OD 1054 X 88 (A516 Gr.70)U TUBE : OD 19.05 X 2.11 MIN WALL (ASTM A179)" 2020 Finish
61 PT ATLAS COPCO AIR RECEIVER TANK 4000 L (6 UNIT) 2020 Finish
62 PT PERTAMINA (PERSERO) RU II DUMAIVESSEL COMPLETE TAG NO 211-V-13 & 212-V-13 2020 Finish
63 PT BHUMI PHALA PERKASA "TUBE BUNDLE (3 UNIT)TUBE SHEET : OD 1054 X 88 (A516 Gr.70)U TUBE : OD 19.05 X 2.11 MIN WALL (ASTM A179)" 2020 Finish
64 PETROGAS (BASIN) LTD REPLACEMENT INSTRUMENT AND PIPING FOR SUPPORT HEAT EXCHANGER AT TOPPING PLAN 2019 Finish
65 PT ENTEK SEPARINDO ASIA SILO DIA 3657.6 MM ID X 11000 MM 2019 Finish
66 PETROGAS (BASIN) LTD TUBE HEAT EXCHANGER AT TOPPING PLANT REPAIR SERVICES 2019 Finish
67 PT PERTAMINA (PERSERO) RU II DUMAIVESSEL COMPLETE TAG NO 100-D-1 2019 Finish
68 PT SHAFTINDO ENERGYSUPPLY OF PIG LAUNCHER & RECEIVER 2019 Finish
69 PT BAKTI NUGRAHA YUDA ENERGY SQUARE TANK DIA 2100mm L x 1600mm W x 2600mm H 2019 Finish
70PT PERTAMINA (PERSERO) RU II DUMAI VESSEL COMPLETE TAG NO 140-V-12 2019 Finish
71 PT PERTAMINA (PERSERO) RU II DUMAI VESSEL COMPLETE TAG NO 140-V-6 2019 Finish
72 PT ENVICO INDONESIA FLARE STACK 2019 Finish
73 PT PETROTEC REKAYASA DINAMIKA AIR RECEIVER TANK 5000 L 2019 Finish
74 PETROGAS (BASIN) LTD REBOILER TUBE HEAT EXCHANGER AT TOPPING PLANT REPAIR SERVICES 2019 Finish
75 PT ENVICO INDONESIA FLARE STACK & TIP 2019 Finish
76 PT BHUMI PHALA PERKASA TUBE BUNDLE (9 UNIT), TUBE SHEET : OD 1054 X 88 (A516-70), U TUBE : 19.05 X 2.11 Min Wall (ASTM-A179), DESIG PRESSURE : 1724 KPA 2019 Finish
77 PT INQUIP MESIN NUSANTARA FABRICATED COLUMN PACKAGE 2019 Finish
78 PETROGAS (BASIN) LTD KNOCKOUT DRUM (CAP 0 - 100 BBL) 2019 Finish
79 PT INQUIP MESIN NUSANTARA SHOP FABRICATED TANKS & PLATEWORK PACKAGE 2019 Finish
80 PT PERTAMINA (PERSERO) PEMBANGUNAN 2 (UNIT) TANKI BLACK PRODUCT DI PT PERTAMINA RU IV CILACAP 2019 Finish
81 PT BHUMI PHALA PERKASA TUBE BUNDLE HEX 901, TUBE SHEET : OD 1048 X 70.8 (SA516-70), TUBE SHEET : OD 1007 X 73.2 (SA516-70), TUBE : 19.05 X 2.159 MIN WALL (SA179), QTY : 1065 EA & DESIG PRESS : 240 Psig 2019 Finish
82 PT PERTAMINA (PERSERO) PEMBANGUNAN 2 (DUA) UNIT TANKI BLACK PRODUK DI PT PERTAMINA (PERSERO) RU IV CILACAP 2019 Finish
83 PT BHUMI PHALA PERKASA TUBE BUNDLE (3 UNIT), TUBE SHEET : OD 1054 X 88 (A516-70), U TUBE : 19.05 X 2.11 Min Wall (ASTM-A179), DESIG PRESSURE : 1724 KPA 2019 Finish
84 PT ENETEK SEPARINDO ASIA ASSY BOTTOM ASH CONVEYOR, ASSY MOTOR FRAME & ASSY SKIRT HOPPER 2019 Finish
85 PT TESTINDO INSTRUMENT AIR RECEIVER DIA : 1500 MM ID X 3000 MM T/T 175 Psig, SHELL : 12 MM, HEAD : 14 MM, MAT'L : SA516-70 & SKID PACKAGE 2019 Finish
86 PT BHUMI PHALA PERKASA L PIN TUBE : 1" X 14 BWG, TUBE MATERIAL SA179 2019 Finish
87 PT BHUMI ARTHAPRIMA CEMERLANG SUPPLY & FABRICATION FOR SPOOLS & SKID 2019 Finish
88 PT DUTA INSTRUMENT ALFA SAKTI GAS FILTER DIMENSION 8" OD X 1,7 M S/S 2019 Finish
89 PT HARAPAN JAYA SENTOSA PRIMA COLLECTOR TANK 5 KL (3 UNIT), DIA : 1500 MM ID X 2750 MM T/T, SHELL : 8 MM, HEAD : 10 MM, MATERIAL : SA516-70 2018 Finish
90 PT ALFA SEMESTA CEMERLANG SKID, PLATFORM & SUPPORT 2018 Finish
91 PT ALFA SEMESTA CEMERLANG PIPING FOR FILTER COALESCER (F601 A/B) 2018 Finish
92 PT SARANA SAMUDRA RAYA LIGHT BUOY SW-220E FEMALE 2018 Finish
93 PT GEA REFRIGERATION INDONESIA BARE PULSPUMP VESSEL, DIA 4" NPS X 750 MM S/S, DESIGN PRESSURE : 23 BARG 2018 Finish
94 ALTON INTERNATIONAL (S) PTE LTD HOT WATER VESSEL (V-5270 A/B) 2018 Finish
95 PT TRIMITRA WISESA ABADI BARE PRESSURE VESSEL, TANK & STRUCTURE 2018 Finish
96 PT BHUMI PHALA PERKASA TUBE BUNDLE GLYCOL HEX PEMATANG, TUBE SHEET : A516-70, TUBE : A179 2018 Finish
97 PT NATIONAL OILWELL VARCO PIPING SPOOL SUCTIONS DAN DISCHARGE SKID & GUARD BELT 2018 Finish
98 PT RAJA ALAM RAYA KO DRUM V503, DIA 48" ID X 144" T/T, DESIGN PRESSURE : 50 PSIG, SHELL : 12 MM A.R (A516-70), HEAD : 12 MM A.F (A516-70) 2018 Finish
99 PT GEA REFRIGERATION INDONESIA SEPARATOR -10C, DIA 2200 ID X 8000 MM, DESIGn PRESSURE 20 BARG, MATERIAL SA516-70 2018 Finish
100 PT BINA RASANO ENGINEERING PIG LAUNCHER & RECEIVER DIA 16" x 12" 2018 Finish
101 PT BHUMI PHALA PERKASA TUBE BUNDLE (2 EA) : TUBE SHEET : OD 1054 X 88 (A516 GR 70), U TUBE : OD 19.05 X 2.11 Min Wall (ASTM A179) & DESIGN PRESSURE : 1724 kPA 2018 Finish
102 PT ALFA SEMESTA CEMERLANG FILTER COALESCER (F601 A/B), DIMENSION : 610 mm OD x 2489 MM/SS 2018 Finish
103 PT CITRA DUA SEJATI PUMP SKID PACKAGE 2018 Finish
104 PT BHUMI PHALA PERKASA TUBE BUNDLE (3 EA) : TUBE SHEET : OD 1054 X 88 (A516 GR 70), U TUBE : OD 19.05 X 2.11 Min Wall (ASTM A179) & DESIGN PRESSURE : 1724 kPA 2018 Finish
105 PT EJJV ENGINEERING INDONESIA KNOCKOUT DRUM (0-100BBL) / WELDING & STATIC EQUIPMENT REPAIR SERVICES 2018 Finish
106 PT BARIMAN PARINDANG INDRAYANI FABRICATION 3 SEGEMENT OF CANAL 2018 Finish
107 PT SHAFTINDO ENERGI SUPPLY OF INSTRUMENT GAS KO POT (DIA : ID 12 INCH X 36 INCH, DESIGN PRESSURE : 260 PSIG, DESIGN TEMP : 275 DEG F, SHELL : SA312 TP316L, HEAD : SA 403 WP 316L) 2018 Finish
108 PT DANAN WINGUS SAKTI SKID 2018 Finish
109 PT PERTAMINA RU IV CILACAP SHELL ASSY, VESSEL ASSY 2018 Finish
110 PT MENTARI GEMILANG ABADI COIL GLYCOL REFLUX CONDENSER DIMENSION 1" NPS SCH 40S 2018 Finish
111 PT RAJA ALAM RAYA PRODUCTION SEPARATOR DIA : 5'-10" ID X 17"-6" T/T & DISCHARGE SCRUBBER DIA 3'-8" ID X 11'-0" T/T 2018 Finish
112 PT CITRA DUA SEJATI TANKI SOLAR 3000 LITER DIA : 1219 MM OD x 2700 MM S/S 2018 Finish
113 PT PERTAMINA RU IV CILACAP TUBE BUNDLE ASSY 2018 Finish
114 PT SAMUDRA SARANA RAKSA PILE BEACON 7,5 M 2018 Finish
115 PT PARAMITA BANGUN SARANA STEAM MAIN HEADER DIA 630 MM OD X 3000 MM S/S, MATERIAL SHELL & HEAD : 10 MM A516 GR 70, PRESSURE : 7,5 Kg / Cm2g & TEMP : 173 DEG C) 2018 Finish
116 PT AGUNG SENTRA SOLUSI JAYA BARE OIL POT (2EA) DIMENSI 10" OD X 900 MM/SS, MATERIAL SHELL : 10" SCH 40 (SA333 GR 6, CAP : 10" SCH 40 (SA420 - WPL6), PRESSURE : 20 BARG & TEMP : -45 DEG C 2018 Finish
117 PT BHUMI PHALA PERKASA GLYCOL HEAT EXCHANGER (DIA : 14" OD X 3018 MM F/F, SHELL MATERIAL 14" SCH XS (A-016B), TUBE SHEET : A516 GR70, TUBE : 3/4" - 10BWG (A179) 2018 Finish
118 PT TRIDAYA MANUNGGAL KARYA HYDRANT PILLAR 2018 Finish
119 PT BORMINDO NUSANTARA MUD GAS SEPARATOR (DIA : 30" OD X 20'-0" S/S, SHELL & HEAD : 10 MM SA516 GR 70, MAWP : 125 PSIG, TEMP : 212 DEG F) 2018 Finish
120 PT BHUMI PHALA PERKASA TUBE BUNDLE (3 EA) : TUBE SHEET : OD 1054 X 88 (A516 GR 70), U TUBE : OD 19.05 X 2.11 Min Wall (ASTM A179) & DESIGN PRESSURE : 1724 kPA 2018 Finish
121 PT DWI GASINDO BARE VESSEL CRYOGAS TANK (DIA : 1900 MM ID X 1652 MM S/S 2018 Finish
122 PT PETROTEC REKAYASA DINAMIKA AIR RECEIVER TANK (3 UNIT) : VOLUME 18000 LTR DIA : 2500 ID X 5100 MM, VOLUME 14000 LTR DIA : 2200 MM ID X 5100 MM, & VOLUME 4000 LTR DIA : 1250 MM ID X 5100 MM 2018 Finish
123 PT GEA REFRIGERATION INDONESIA LIQUID TRAP (DIA : 900 ID X 2900 S/S, DESIGN PRESSURE : 18 BARG, DESIGN TEMP : -40 DEG C, SHELL : 8 MM SA516-70 & HEAD : 10 MM SA516-70) 2018 Finish
124 PT SHAFTINDO ENERGI SUPPLY OF INSTRUMENT GAS KO POT (DIA : ID 12 INCH X 36 INCH, DESIGN PRESSURE : 260 PSIG, DESIGN TEMP : 275 DEG F, SHELL : SA312 TP316L, HEAD : SA 403 WP 316L) 2018 Finish
125 PT SAMUDRA SARANA RAKSA GALVANIZED PILE BEACON 10 M 2018 Finish
126 PT ADI JAYA MANDIRINDO MPU4 2018 Finish
127 PT SAMUDRA SARANA RAKSA SHALLOW WATER LIGHT BUOY SW-240 E FEMALE (DIA : 2400 MM OD X 1300 MM) 2018 Finish
128 PT SAMUDRA WIWACA KUSUMA PARTIAL PART FOR DEMO VESSEL 2018 Finish
129 PT BHUMI PHALA PERKASA TUBE BUNDLE (2 EA) : TUBE SHEET : OD 1054 X 88 (A516 GR 70), U TUBE : OD 19.05 X 2.11 Min Wall (ASTM A179) & DESIGN PRESSURE : 1724 kPA 2018 Finish
130 PT CITRA DUA SEJATI VESSEL & TANKI 2017 Finish
131 CV SARANA SAMUDERA RAYA GALVANIZED PILE BEACON 7.5 M 2017 Finish
132 PT DWI GASINDO ACETYLENE PURIFIER TANK DIA 1512 ID X 990 S/S 2017 Finish
133 PT DWI TUNGGAL JAYA AGUNG FABRICATION TANK DIA : 1500 MM ID X 2350 MM T/T & SKID DIA 2000 W X 4500 MM L X 200 H 2017 Finish
134 PT SARANA SAMUDERA RAKSA PILE BEACON 5 M 2017 Finish
135 PT CITRA DUA SEJATI AIR TANK, 60 GAL CAPACITY 2017 Finish
136 PT NATIONAL OILWELL VARCO PIPIING SPOOL & SKID 2017 Finish
137 PT TRIMITRA WISESA ABADI BARE VESSEL FILTER (CAP 6 T) / BOILER, DIA : 2500 MM X 4800 S/S 2017 Finish
138 PT SARANA SAMUDERA RAKSA PILE BEACON 10 M 2017 Finish
139 PT DUTA INSTRUMENT ALFA SAKTI METERING SYSTEM 16" - ANSI 300# SCH 40 2017 Finish
140 PT ANUGERAH MORTAR ABADI SILO 70 M3 2017 Finish
141 PT SARANA SAMUDERA RAKSA PILE BEACON 7.5 M 2017 Finish
142 PT SARANA SAMUDERA RAKSA PILE BEACON 7.5 M 2017 Finish
143 PT SARANA SAMUDERA RAKSA GALVANIZED PILE BEACON 7,5 M 2017 Finish
144 PT SARANA SAMUDERA RAKSA GALVANIZED PILE BEACON 10 M 2017 Finish
145 CV SARANA SAMUDERA RAYA SHALLOW LIGHT BUOY SW-240E, GALVANIZED PILE BEACON 10 M & 7,5 M 2017 Finish
146 PT RIZKY ANUGERAH ENGINEERING AIR RECEIVER TANK, DIA : 700 MM ID X 700 MM S/S, SHELL : 16 MM, HEAD : 16 MM, MATERIAL : A516-70 2017 Finish
147 PT SARANA SAMUDERA RAKSA LIGHT BUOY SW240-E & PILE BEACON 5 M 2017 Finish
148 PT DUTA INSTRUMENT ALFA SAKTI METER TUBE 18" SCH XS - ANSI 300 2017 Finish
149 PT SARANA SAMUDERA RAKSA GALVANIZED ONE PILE BEACON 7.5 M (KUNING) & SHALLOW WATER LIGHT BUOY SW 220 (HIJAU) 2017 Finish
150 PT INDUSTRI KOMPRESSOR INDONESIA RETUBING HEAT EXCHANGER 2017 Finish
151 PT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD ATMOSPHERIC TEST SEPARATOR, DIA 3000 MM X HEIGHT 8200 MM X TH 12 MM 2017 Finish
152 CV SARANA SAMUDERA RAYA GALVANIZED ONE PILE BEACON 7.5 M 2017 Finish
153 PT GASPRO SENTRACO MACHINING TUBESHEET & MACHINING BAFFLE 2017 Finish
154 PT INAKO PERSADA AIR RECEIVER TANK (UTILITY AIR TANK) CAPACITY : 1400 LITER & PIPING AND SKID 2017 Finish
155 PT DUTA INSTRUMENT ALFA SAKTI DRY GAS FILTER 8" - ANSI 300#, DIA : 8" NPS X 1626 MM S/S, DESIGN PRESSURE : 700 PSIG 2017 Finish
156 PT DUTA INSTRUMENT ALFA SAKTI DRY GAS FILTER 16" - ANSI 300#, DIA : 16" NPS X 1820 MM S/S, DESIGN PRESSURE : 700 PSIG 2017 Finish
157 PT DUTA INSTRUMENT ALFA SAKTI DRY GAS FILTER 24" - ANSI 300#, DIA : 24" NPS X 2200 MM S/S, DESIGN PRESSURE : 720 PSIG 2017 Finish
158 PT PARAMITA BANGUN SARANA SILENCER OD : 844 MM x 1000 MM 2017 Finish
159 PT YERRY PRIMATAMA HOSINDO GASOLINE FILTER DIA : 1169 MM X 3484 MM & WATER FILTER DIA 735 MM X 2865 MM 2017 Finish
160 PT NINDYA KARYA DIESEL STORAGE TANK DIA : 1100 MM X 1700 MM SS400 & AIR RECEIVER TANK DIA : 1600 X 2250 MM SS400 2016 Finish
161 PT ADI JAYA MANDIRINDO MPU UNIT 2016 Finish
162 CV. SARANA SAMUDRA RAYA GALVANIZED ONE PILE BEACON 14 M & GALVANIZED ONE PILE BEACON 7,5 M 2016Finish
163 PT PERTAMINA (PERSERO) RU IV CILACAP PENGGANTIAN TANKI 43T-4 DI AREA 43 PERTAMINA (PERSERO) RU IV CILACAP 2016 Finish
164 CV. SARANA SAMUDRA RAYA MOORING BUOY DIA 3000 MM OD X 2241.800 MM HEIGHT (4 UNIT) 2016 Finish
165 PT GASPRO SENTRACO SERVICE RETUBING PROPANE HEATER & BUTHANE HEATER 2016 Finish
166 CV. SARANA SAMUDRA RAYA MOORING BUOY DIA 3000 MM OD X 1900 MM HEIGHT (4 UNIT) 2016 Finish
167 PT PETROPEC REKAYASA DINAMIKA SKID & INSTRUMENT AIR COMPRESSOR PACKAGE (AIR RECEIVER TANK) 2016 Finish
168 PT PERTAMINA (PERSERO) RU IV CILACAP PENGGANTIAN COLUMN 91C403 BESERTA ACCESSORIESNYA DI UNIT SRU 2016 Finish
169 CV. SARANA SAMUDRA RAYA GALVANIZE ONE PILE BEACON 14 M 2016 Finish
170 PT ALGAS MITRA SEJATI FABRIKASI MR/S CUSTODY MODEL 8/8-25/18-16-5 MMSCFD-G400-300# & NON MODEL 8/4-16/10-8/3-2/1 MMSCFD-G400-150# 2016 Finish
171 PT PARAMITA BANGUN SARANA PROJECT REPARASI SPRAY TOWER 2016 Finish
172 PT TETRAPAK STAINLESS EQUIPMENT SKIRT SILO 120.000 L (3 UNIT) 2016 Finish
173 PT DRACO INTERNASIONALBARE VESSEL SCRUBBER 16''-150# 2016 Finish
174 PT DWI GASINDO - (ASME) AIR RECEIVER TANK DIA : 1829 MM ID X 3300 MM T/T, MATERIAL SA516-70 2016 Finish
175 PT. GASPRO SENTRACO PROPANE HEATER DIA 1219 MM ID X 6700 MM T/T, SHELL : 12.7 MM, HEAD : 14 MM & CONDENSER 2016 Finish
176 PT. FEDSIN REKAYASA PRATAMA - PT. ALTON BARE VESSEL DEGASSER VESSEL & HYDROCYCLONE FOR PROCEDURE WATER TREATMENT PACKAGE 2016 Finish
177 CV. SARANA SAMUDRA RAYA GALVANIZE PILE BEACON 7.5M (2 UNIT) 2016 Finish
178 PT. RAMAI JAYA ABADI FABRICATION STORAGE TANK (3 UNIT) DIA : 4000 MM ID X 7000 MM HEIGHT 2016 Finish
179 PT. WITRACO PERDANA SPREADER BAR CAP 60 TON (2 UNIT) 2016 Finish
180 PT. DWI MUTIARA SEJAHTERA HYDROGENT TANK CAP. 25 M3 DIMENSION : DIA. 2150 MM OD X 6900 MM S/S 2016 Finish
181 PT. INAKO PERSADA FABRICATION PIPING (A312 TP316l) & SKID (A36/SS400) FOR 2 UNIT AIR COMPRESSOR 2016 Finish
182 PT DWI GASINDO BUCKET PURIFIER & BAK KOMPRESSOR 2016 Finish
183 PT. BUANA NITTANINDO GAS 1 UNIT PROPANE TRANSPORT TANK KAPASITAS : 10.000 KG (10 TON) VOLUME : 23.212 LITER 2016 Finish
184 PT. DUTA INSTRUMENT ALFA SAKTI SUPPLY & FABRICATION GAS METERING SYSTEM 2"-ANSI 300# 2016 Finish
185 PT. PARAMITA BANGUN SARANA PEKERJAAN FABRIKASI BAJA VESSEL TANKS (9 UNIT)TANKS GAUNG OLEOCHEMICAL PROJECT-BLOCK 2 DI DUMAI 2016 Finish
186 PT. DUTA INSTRUMENT ALFA SAKTI GAS FILTER-PETROCHINA BARE VESSEL SCRUBBER 6”-300# (2 UNIT) 2016 Finish
187 PT. INAKO PERSADA BARE VESSEL AIR INSTRUMENT TANK, DIA 510 MM OD X 1220 S/S, DESIGN PRESSURE : 10 BARG, SHELL : 8 MM, CAP : SCH.10 2016 Finish
188 PT KIMIA YASA TANGKI CAP 4 TON - ST 417 & ST 418 (2 UNIT) 2015 Finish
189 PT KIMIA YASA TANGKI CAP 4 TON - ST 416 (1 UNIT) 2015 Finish
190 PT KIMIA YASA TANGKI CAP 4 TON - ST 415 (1 UNIT) 2015 Finish
191 CV. SARANA SAMUDRA RAYA JASA FABRIKASI HOOK LIGHT BUOY OD. 44.45 MM, LENGTH : 2000 MM (21 UNIT) 2015 Finish
192 CV. SARANA SAMUDRA RAYA SHALLOW WATER LIGHT BUOY (SW-240E) 2015 Finish
193 PT. TORINDO UTAMA SAKTI GAS SCRUBBER - TANJUNG PRIOK - PERTAMINA GAS (DIA : 10" NPS X 1850 S/S) 2015 Finish
194 PT. TORINDO UTAMA SAKTI GAS SCRUBBER - SEMARANG - PERTAMINA GAS (DIA : 10" NPS X 2130 S/S) 2015 Finish
195 PT. TORINDO UTAMA SAKTI GAS SCRUBBER - CIREBON - PERTAMINA GAS (DIA : 10" NPS X 2130 S/S) 2015 Finish
196 PT. DUTA INSTRUMENT ALFA SAKTI GAS METERING SYSTEM 2" - ANSI 600# 2015 Finish
197 PT. DRACO INTERNASIONAL BARE VESSEL SCRUBBER 16"-150# (2 UNIT) & INSTRUMENT PSV 2015 Finish
198 PT. SAS INTERNATIONAL PEKERJAAN FABRIKASI SPOOL 7.5 D 2015 Finish
199 PT. PERTAMINA RU IV CILACAP PENGGANTIAN TANKI 43T102 2015 Finish
200 PT. TORINDO UTAMA SAKTI PEMBANGUNAN INSFRASTRUKTUR SPBG MOTHER STATION DI BALIKPAPAN KAPASITAS 1 MMSCFD.(BARE VESSEL SCRUBBER 8""-150#) 2015 Finish
201 PT. TORINDO UTAMA SAKTI PEMBANGUNAN INSFRASTRUKTUR CNG ONLINE STATION BEKASI KAPASITAS 0,5 MMSCFD ".( BARE VESSEL SCRUBBER 6"-150# ) 2015 Finish
202 PT. GUNANUSA UTAMA FABRICATORS PHE WMO EPSC1 PROJECT 2015 Finish
203 PT. REKAYASA INDUSTRI INSTALL SKID & MOTOR CTDD 2015 Finish
204 CV. SARANA SAMUDRA RAYA MOORING BUOY DIA 2600 MM OD X 1900 MM 2015 Finish
205 PT. ALAM BERSEMI SENTOSA SCRUBER & FILTER PACKAGE, S/B & PAINTING PIPING 2015 Finish
206 PT. PERTAMINA RU II DUMAI PENGADAAN & PEMASANGAN LIQUID SEAI DRUM C/W ACCESSORIES DI AREA 915 OIL MOVEMENT KILANG RU II DUMAI. 2015 Finish
207 PT. YUDISTIRA ENERGY MODIFIKASI PROPANE CONDENSER C/W MATERIAL ETC. 2015 Finish
208 PT. PETROTEC REKAYASA DINAMIKA SKID INTERCONNECTING PIPING PACKAGE & AIR RECEIVER 2015 Finish
209 PT. TRIMITRA WISESA ABADI DUCTING STAINLESS STEEL 304 2015 Finish
210 CV. SARANA SAMUDRA RAYA LIGHT BUOY (3 UNIT) 2015 Finish
211 PT. CITRA DUA SEJATI KNOCK OUT DRUM DIA : 1219 MM OD X 24384 MM S/S, SHELL : 10 MM, HEAD : 12 MM 2015 Finish
212 PT. SAS INTERNATIONAL GAS METERING SYSTEM 6"-ANSI 600# 2015 Finish
213 PT. DUTA INSTRUMENT ALFA SAKTI EXISTING PIPING 4" (PERTAMINA E&P SIMENGGARIS) 2015 Finish
214 PT. TRIMITRA WISESA ABADI BOILER CAP.5 TON DIA : 2200 MM OD X 4600 MM S/S, DESIG PRESSURE : 12 BARG, SHELL : 14 MM, TUBE PLATE : 20 MM 2015 Finish
215 PT. INAKO PERSADA SKID INTERCONNECTING PIPING PACKAGE 2015 Finish
216 PT ADIGUNA SHIPBUILDING & ENGINEERING AIR RECEIVER TANK" (QTY 2-EA) DIA 3,6" OD X 8,6" S/S SHELL : 0.315", HEAD : 0.375 2015 Finish
217 PT. GASPRO SENTRACO SUPPLY & FABRICATION BARE VESSEL - PILONA 2015 Finish
218 PT. REKAYASA INDUSTRI SUPPLY & FABRICATION MOUNTING ADAPTOR MOTOR 2 UNIT - DARAJAT, GARUT, JAWA BARAT 2015 Finish
219 PT. CITRA DUA SEJATI SUPPLY & FABRICATION CONTAINER FOR MMC PANEL 2015 Finish
220 PT. TRIMITRA WISESA ABADI VESSEL 2015 Finish
221 PT. DUTA INSTRUMENT ALFA SAKTI SUPPLY AND FABRICATION GAS METERING SYSTEM 16" ANSI 300# SCH. 40 2015 Finish
222 PT. PGN SOLUTION AIR RECEIVER DIA 1300 MM ID X 3000 MM T/T SHELL : 12 MM, HEAD : 12 MM & VENT STACK 2015 Finish
223PT. GRAHA WIDYA ABADI STEEL WATER TANK, CAP. 500 DIA 3658 MM ID X 7620 MM S/S SHELL : 10 MM, HEAD : 10 MM 2015 Finish
224 PT. YUDISTIRA HAKA PERKASA REG. GAS HEATER E-600 DIA 26" OD X 6844 MM L H/H, SHELL : API 5L GR B, TUBE : SA179 & DRY GAS FILTER F-601 DIA 26" OD X 3340 MM, SHELL : API 5L GR B, HEAD : SA234 GR WPB 2015 Finish
225 PT. ALAM BERSEMI SENTOSA SECOND STAGE SEPARATOR" FABRIKASI TEST/PRODUCTION SEPARATOR 96 DIA : 2438 OD X 9752 S/S 2015 Finish
226 PT. GASPRO SENTRACO BARE PRESSURE SCRUBBER DIA 10" NPS SCH. STD X 1979 SS & DIA 6" NPS SCH. STD. X 2085 S/S 2015 Finish
227 CV. SARANA SAMUDRA RAYA FABRICATION "GALVANIZE PILE BEACON 3M" (2 UNIT) 2015 Finish